The floor needs replacing. Losing a day's work isn't an option. Your team can't arrive Monday to a building site. We've heard this before — and we know exactly what to do.
We replace office carpet tiles over the weekend — Friday night to Sunday evening — so your team walks in Monday to a finished floor. No packing up desks, no lost productivity, no visible mess. We manage every trade ourselves, from the first tile lifted to the last piece of furniture back in place. You don't need to be there.
We survey the floor before quoting — screed condition, existing adhesive residue, access routes, and any subfloor issues that could affect the finished result.
We arrive Friday evening with our own lifting equipment, materials, and a site manager on-site for the duration.
We lift furniture using our own systems, strip the old carpet tiles, lay the new ones, replace everything, and leave the space clean.
You receive a handover report on Sunday — photographs, condition notes, and waste disposal certificates, ready for your landlord or asset manager.
We use specialist furniture lifting systems that move workstations without disconnecting equipment. Desks, pedestals, monitors — moved and returned to the same position, cables intact. No IT involvement required. No exceptions to chase up on Monday morning.
Most FM managers don't ask about this until something goes wrong. We plan for it on day one.
of installations completed without requiring IT to disconnect or reconnect workstation equipment
We work entirely outside office hours. Your team returns Monday to a finished floor — not a half-finished job with tools still on-site. Weekend working isn't a workaround for us; it's how we plan the job from the start.
Our vetted specialists are managed by a Renova site manager throughout the job. Every operative is briefed, supervised, and accountable to us. If something needs a decision at 11pm on Saturday, we make it — not you.
Flooring, furniture lifting, waste removal, and handover documentation — all under a single contract. You're not coordinating between a flooring firm, a removals company, and a waste contractor. There's one number to call if you need anything.
HSE compliance. All work is carried out in line with Health & Safety Executive (HSE) guidance for occupied commercial premises. Our site manager holds the relevant RAMS documentation before any operative sets foot on site. You have a single point of accountability.
Send us the basics — building, floor area, access — and we'll come back with a realistic scope and a weekend slot. No commitment, no hard sell.
Specifics matter. Here's how a typical weekend installation runs.
Crew arrives. Furniture lifted and moved using our lifting systems. Access routes cleared.
Old carpet tiles stripped. Screed condition checked and signed off. Any remedial work completed overnight.
New carpet tiles laid. Site manager on-site throughout. Progress photos taken at each stage.
Furniture returned to position — same desk, same orientation. Snagging walk. Full clean.
Handover report sent. Photographs, condition notes, waste disposal certificates. Your floor is ready.
Replacing floors ahead of lease expiry? Our dilapidations team can advise on scope and cost before you commit to a specification.