✦
Dilapidations & Cat A Fit-outs · London & South East

Professional Flooring Reinstatement for Office Dilapidations and Category A Fit-outs

Your lease is ending. The schedule of dilapidations is on your desk. Every week the floor isn't reinstated is a week closer to a legal dispute — or a landlord withholding the deposit. We fix that.

Trusted by
TENANTS PROPERTY MANAGERS SURVEYORS FACILITIES MANAGERS MANAGING AGENTS
What this service covers

Scope of Works

We carry out flooring reinstatement from strip-out to handover — under a single JCT Minor Works Contract, with documented completion at every stage.

01

Strip-out and disposal

Existing floor finishes removed, bagged, and disposed of in compliance with waste transfer regulations. Site left clean and clear before reinstatement begins.

02

Sub-floor preparation and repair

Moisture readings taken. Screed assessed and repaired where required. Surface ground and levelled to tolerances specified by the floor covering manufacturer. No tile goes down until the sub-floor passes.

03

Carpet tile supply and installation

Category A fit-out specification carpet tile, supplied and installed to the reinstatement spec derived from the schedule of dilapidations or the incoming tenant's Cat A brief.

04

Raised access floor reinstatement

Where the schedule requires it, we reinstate raised access floor panels — relevelling, replacing damaged tiles, and restoring pedestals to the condition specified at lease commencement.

05

Handover documentation

Full O&M manual on completion. Installation certificates, product data sheets, waste transfer records, and a photographic schedule of the finished floor — everything the surveyor needs at re-inspection.

06

Multi-trade coordination

Where flooring reinstatement requires prior partition removal, we manage that work under the same contract. One programme. One point of contact. No scheduling gaps between trades.

Technical credibility

Sub-floor Preparation: Why It's Not Optional

Most flooring contractors treat the sub-floor as something to tile over. We don't. Before a single carpet tile goes down, we take moisture readings, assess the screed condition, and identify any areas requiring repair or grinding.

Screeds that are too wet cause adhesive failure. Screeds that are uneven cause tiles to peak, lift, or crack. Surface contaminants from old adhesive prevent proper bond. None of these failures are apparent on day one — they show up three months later when the incoming tenant complains, or six months later when the landlord's surveyor re-inspects and finds the floor doesn't meet yield-up condition.

Acceptable flatness tolerances vary by floor covering type, but as a baseline we work to a maximum 3mm deviation under a 1.8-metre straight-edge before installation proceeds. Where we find screed defects, we repair with a suitable levelling compound rated to the applied load. We don't tile over problems and hope they hold.

"We survey the screed before a tile goes down. Most contractors skip this. It's why floors fail six months later and why your surveyor comes back."

For technical buyers who want product-level specification detail, see our commercial carpet tiles page.

Legal context

The Schedule of Dilapidations and Why Compliance Isn't Negotiable

The schedule of dilapidations is a formal document produced by the landlord's surveyor. It sets out the tenant's obligations under the lease — what must be repaired, reinstated, or removed before the property is handed back. The floor specification in that schedule is not a suggestion.

Under Section 18 of the Landlord and Tenant Act 1927, the landlord's claim for dilapidations is capped at the diminution in the property's value — not the cost of the works. But that cap only applies to the litigation. Non-compliant reinstatement work still creates a disputed handover, delays your exit, and exposes you to additional surveyor fees, legal costs, and potential retention of the deposit.

RICS guidance on yield-up condition is clear: the property must be returned in the condition required by the lease, taking into account fair wear and tear. Where the floor forms part of a Category A fit-out obligation, the reinstatement spec must meet that standard — both at installation and on re-inspection. Workmanship, materials, and documentation all count.

We work directly from the schedule of dilapidations. The spec we price from is the spec we deliver against. If you need the broader dilapidations picture — Scott Schedule, surveyor negotiation, full works coordination — see our main dilapidations service page.

Schedule of Dilapidations Section 18 LTA 1927 Yield-up Condition RICS Guidance Category A Fit-out JCT Minor Works Contract
Why Renova

What Makes This Different from a Standard Flooring Contractor

Flooring reinstatement for dilapidations is not the same as a fit-out installation job. The spec derives from a legal obligation. The documentation must satisfy a surveyor. The programme must hit a lease-end date. These are the things we manage.

01

Multi-trade coordination under one contract

Floor reinstatement often requires partition removal first. We handle floor grinding, partition removal, and carpet tile installation under one point of accountability. Your exit schedule doesn't depend on three contractors talking to each other — or failing to. One contract. One programme. One person answers the phone when something needs resolving.

02

Professional handover documentation as standard

You receive a full O&M manual on completion. It includes installation certificates, product data sheets, sub-floor survey records, waste transfer documentation, and a photographic schedule. It satisfies lease obligations and gives the surveyor what they need on re-inspection. We don't ask for a second visit.

03

Out-of-hours and weekend working

If the floor has to be done without disrupting current occupation, we work around it. Early starts, evenings, weekends — we're used to it. Occupied office upgrades and dilapidations work to tight handover dates are a regular part of our programme, not an exception.

04

Vetted subcontractors under Renova management

Every subcontractor we use has been vetted and works to our standards — not the standards they apply when working direct. They're on our programme, under our supervision, delivering against our quality checks. One contract. One point of accountability. No surprises on handover day.

05

Sub-floor survey before works start

This is where cheap contractors fail. We survey the sub-floor before pricing and before installation. If there's a problem — moisture, poor screed, uneven surface — we tell you upfront, price the repair into the scope, and fix it. You don't discover it six months later via a surveyor's complaint.

Ready to move forward?

Send us your schedule — we'll come back within 48 hours

If you have a schedule of dilapidations, a Cat A brief, or a site that needs surveying before reinstatement, get in touch. We'll review what you've sent, ask the questions that matter, and come back with a clear scope and timeline.

No drawn-out tender process. No obligation to proceed.

Project types and geography

Where We Work and What We Cover

Project types

Geography

  • Central and Greater London
  • Kent — Maidstone, Dartford, Sevenoaks, Medway
  • M25 corridor — Surrey, Essex, Hertfordshire
  • Out-of-hours coverage across all regions
What happens next

Four Steps from Enquiry to Handover

No drawn-out tender process. No endless back-and-forth. Here's exactly what you're committing to when you send us your schedule.

01

Send us your schedule or brief

Email us the schedule of dilapidations or your Cat A brief. We respond within 48 hours with an outline scope and a site visit date.

02

Site visit and sub-floor survey

We visit site, survey the sub-floor condition, and assess the scope against the schedule. We flag problems at this stage — not after works start.

03

Fixed-price scope and programme

You receive a fixed-price quotation with a clear programme and milestones. Scope is locked before works start. No surprises mid-project.

04

Delivery and handover documentation

Works completed to programme. O&M manual, certificates, and photographic schedule issued on completion. Ready for surveyor re-inspection.

Send us your dilapidations schedule

We'll come back with a scope and timeline within 48 hours

No hand-holding required. If you have a schedule, a Cat A brief, or a site that needs surveying — get in touch and we'll take it from there.

Further Reading

Article

What are Dilapidations in a Commercial Lease?

Article

End of Lease Dilapidations: Should You Pay the Bill or Do the Works?

Article

Specifying Commercial Carpet Tiles: A Technical Guide

Article

Office Painting as Part of Dilapidations Works