📋
CHAS Accredited · Lease Exit Specialists

Office Dilapidations London & South East

Fixed-price works. Free site survey within 48 hours. One team from survey to handover — covering London, Kent, Surrey & Essex.

Your lease is ending and the landlord's schedule has arrived. The numbers look large and you need to know whether they're reasonable — and what it would actually cost to get the works done yourself. We can tell you both, from a free site visit, within 48 hours.
We support
COMMERCIAL TENANTS LANDLORDS MANAGING AGENTS CHARTERED SURVEYORS
Accredited
What We Do

One team, one contract,
complete lease exit

Office dilapidations are the repairs, removals and reinstatement works a tenant must complete when a commercial lease ends. We handle the whole thing — strip-out, structural repairs, flooring reinstatement, ceilings, M&E making-good, and full redecoration — under a single contract with one point of accountability.

You don't coordinate multiple trades. You don't manage a programme. You hand us the schedule and we return you a compliant building.

End-of-lease strip-out
Structural & cosmetic repairs
Flooring reinstatement
Ceiling & M&E making-good
Full internal redecoration
Surveyor collaboration
Lease handover documentation
Works around your schedule. We regularly carry out dilapidations in occupied buildings and during phased exits — evenings, weekends, or floor by floor. If access or timing is a constraint, tell us when you enquire and we'll build the programme around it.
CHAS Accredited: Renova Projects UK holds CHAS accreditation — independently verifying our health & safety standards on every project.
Get a free survey →
Commercial office space after dilapidations works — Renova Projects UK deliver lease-end strip-out and reinstatement across London and the South East
Cost Guide

What do office dilapidations
actually cost?

Scope Typical range (per sq ft) What drives the cost
Light works
Redecoration, minor repairs, basic making-good
£8 – £15 Condition of existing finishes, paint specification, access arrangements
Mid-range works
Strip-out, flooring reinstatement, ceiling repairs, redecoration
£15 – £25 Volume of tenant alterations, floor finish spec, M&E making-good requirement
Full reinstatement
Complex fit-out removal, raised floors, major structural works
£25 – £45 Raised floor removal, ceiling grid reinstatement, phasing requirements, specialist M&E
Don't forget the add-ons. A typical landlord's claim includes more than just the building works. Add 10–15% for preliminaries and project fees, plus the landlord's own professional fees (surveyor, legal). On a recent 500 sq ft London office, the works were £9,695 — but the total claim including fees came to £15,108. Getting your own priced schedule gives you a defensible figure to challenge with.

These are guide figures based on RICS data and recent project experience. Actual costs depend on condition, specification, access and the detail of your lease obligations. A free site visit is required for an accurate fixed-price quote.

Who This Is For

The situations we deal with
every week

Tenants approaching lease end

Your lease expires in the next 6–12 months and you either have a schedule in hand or expect one. You need to know what the works will actually cost — not what the landlord's surveyor says they'll cost — and whether it makes more sense to do the works or negotiate a cash settlement. We price both options honestly.

Landlords preparing for re-letting

Your tenant is vacating and the space needs to be returned to a lettable condition. If the tenant isn't delivering to the required standard, we can work directly from the schedule and recover costs on your behalf. We can also move straight into a refurbishment or fit-out once dilapidations are complete — the same team, no handover gap.

Managing agents and property managers

You manage multiple properties and lease exits are a regular occurrence. You need a contractor who understands the RICS protocol, works efficiently against a schedule, and doesn't require hand-holding. We handle dilapidations as part of broader property management programmes across London and the South East.

FM teams managing portfolio exits

You're coordinating multiple lease exits across a portfolio — each with different surveyors, landlords and timelines. We work as a consistent delivery partner, providing pre-agreed rates, standardised reporting, and a single point of contact across multiple sites. If you also have PPM contracts to manage, we can fold those in too.

How It Works

From first call to
lease handover

01
Within 48 hours

Free Site Survey

We visit the site, review your schedule of dilapidations alongside the lease terms, and assess current condition. No charge. No obligation. We'll tell you upfront if something on the schedule looks unreasonable.

02
Within 3–5 working days

Fixed-Price Quote

A fully itemised quote covering every element of the schedule — no provisional sums, no day-rate exposure. You see exactly what each line costs before committing to anything.

03
Agreed start date

Scheduled Works

We programme the works around your lease exit date, access constraints, and any occupancy requirements. Phased delivery, out-of-hours working, or a clean handover day — whatever the situation demands.

04
Sign-off & close-out

Snagging & Handover

We carry out a full snagging inspection before handover and provide complete documentation — photographic evidence, waste transfer notes, and certificates where required — so the landlord can't come back with a list after you've left.

When to act

The right moment is usually sooner than you think

📅

Lease expiring in 6–12 months

Leaving it to the last few months means working to the landlord's timeline and their contractor prices. Acting early keeps control on your side.

📄

Schedule of dilapidations received

The landlord's surveyor has served a schedule. Before you accept their costs, get your own contractor's view on what the works actually require.

💬

Negotiating a cash settlement

A priced contractor schedule gives you a defensible figure. Without one, you're negotiating against the landlord's numbers without any basis to push back.

📋

Interim schedule served mid-lease

Landlords can serve interim schedules during the tenancy. Early intervention is cheaper than leaving a long list to accumulate before exit.

🏢

Lease renewal coming up

Understanding your reinstatement obligations before signing a renewal helps you factor exit costs into the commercial decision on whether to stay or go.

📁

Portfolio programme planning

If you manage multiple leases, forward planning with a single contractor means consistent pricing and no scramble to find available capacity at short notice.

The Detail

How dilapidations work
in practice

Schedule types: interim vs terminal

An interim schedule is served during the lease when conditions have deteriorated. A terminal schedule is served at lease end — the most common type we work from. Both carry legal weight under your lease. We work from whichever applies, and can help scope works before a formal schedule is issued if that's helpful for budgeting.

The RICS Pre-Action Protocol

The RICS Dilapidations Pre-Action Protocol sets out how landlords and tenants should handle disputes before they reach court. It requires surveyors to exchange schedules and responses in a structured way. Understanding this process matters — it prevents either side from being ambushed with costs and sets the frame for negotiation.

Scott Schedule — when you need one

A Scott Schedule is a formal document recording each item of disrepair with the landlord's and tenant's positions on cost and liability set side by side. It is used in mediation or court proceedings. Most dilapidations disputes settle before that stage, but a priced Scott Schedule from a contractor is a powerful negotiating tool and we can provide one.

Section 18 — the cap on damages

Under Section 18(1) of the Landlord and Tenant Act 1927, a tenant's liability is capped at the diminution in the property's value caused by the disrepair — not necessarily the full cost of the works. If the landlord is redeveloping or refitting the space, some or all of your liability may be reduced. A building surveyor can advise; we provide the contractor pricing to support that case.

What a compliant handover looks like

A clean handover means more than just the physical works being done. Documentation matters: waste transfer notes, asbestos confirmations where applicable, photographic evidence, electrical certificates, and a clear snagging sign-off. We provide all of this as standard. Landlords have a limited window to raise claims after handover — don't give them a reason.

Working alongside your surveyor

We collaborate closely with chartered surveyors on both sides of a dilapidations claim. We can price against an existing schedule, attend site with a surveyor, provide a counter-schedule if works are being disputed, or simply supply the contractor costs to support a negotiated settlement. We understand the RICS protocol and price accordingly.

Who We Work With

Built for the people who
deal with lease exits

🏢

Commercial tenants

Your lease is ending and you need the works done efficiently and at a defensible cost. We price from your schedule, challenge anything that looks excessive, and deliver a clean handover so you can exit without a residual liability hanging over you.

🏗️

Landlords & asset managers

Your tenant is vacating and the space needs to be brought back to a lettable standard. We work directly from the schedule and coordinate quickly to minimise void period. If you're planning a full refurbishment afterwards, the same team can move straight on to that.

📋

Managing agents & surveyors

You need a contractor who understands RICS protocol, prices accurately against a schedule, and doesn't create problems at handover. We work within the formal dilapidations process, provide documentation as standard, and communicate clearly throughout — no chasing required.

🔑

Facilities managers

You're managing lease exits across a portfolio — different buildings, different landlords, different timelines. We work as a consistent delivery partner: agreed rates, standardised processes, single point of contact. Planned maintenance contracts can be managed alongside if needed.

📊

Finance & legal teams

You're assessing dilapidations liability for accounts, due diligence, or lease negotiations. We provide detailed priced schedules that can be used for provisioning, dispute resolution or settlement negotiations — not vague estimates, specific line-by-line costs.

❓

Not sure if you fit?

If your situation involves a commercial lease exit and construction works, we're probably the right contractor. Get in touch and we'll tell you straight whether we're the right fit for your job — and if not, we'll point you in the right direction.

Not sure whether your situation fits? Get in touch and we'll tell you straight.

Why Renova

One team, one contract,
full accountability

🏗️

Commercial background, not domestic

We work exclusively in commercial buildings — offices, managed workspaces, retail and industrial. We understand lease obligations, RICS protocol, and what a compliant commercial handover actually requires. We don't do domestic refurbishments.

🤝

Single contract, single point of accountability

Every trade is managed by us — no subcontractor chains you have to manage yourself. Strip-out, repairs, flooring, ceilings, decorating — all under one contract. If something isn't right, one call sorts it.

💷

Fixed price, no provisional sums

We quote after a site visit, not from desk estimates. The price you agree is the price you pay — no provisional sums that expand once the work starts. If we find something unexpected, we tell you before we act, not after.

🕐

Works around your handover date

Lease exits have hard deadlines. We programme works to meet them — including evenings, weekends and phased delivery where the building is still occupied. Tell us your constraints when you enquire and we'll design the programme around them.

📋

CHAS accredited — documentation ready

CHAS accreditation means our health & safety standards are independently verified. Procurement packs, method statements, risk assessments and insurance certificates are available without chasing. Surveyors and managing agents find this makes the process significantly easier.

📍

Based in Kent, active across London and the South East

We're based in Westerham, Kent and cover London, Surrey, Essex and the wider South East. We're honest about geography — if a job is outside our coverage area, we'll say so. We won't take work we can't deliver to the right standard.

5.0
Client Rating

"Renova Projects UK has consistently proven to be our top choice for building works. Their team delivers a high standard of quality and attention to detail — and the results speak for themselves."

PF
P Fewins
Russell Fewins Ltd
Russell Fewins Ltd
Lease ending soon?

Get a fixed-price quote
before you need one urgently

The earlier you know your costs, the more options you have — settle, negotiate, or do the works yourself on your timeline, not the landlord's.

Coverage

London, Kent, Essex
& the M25 corridor

London

We carry out office dilapidations across all London zones — City and West End to South and East London. Much of our dilapidations work is in and around the commercial districts of Central and Inner London, where lease exits are frequent and landlord expectations are high.

City of London West End Canary Wharf Shoreditch Clerkenwell Victoria Charing Cross Covent Garden Marylebone Fitzrovia Aldgate Bermondsey Tower Hill Battersea Brixton Islington Canonbury Highbury Kentish Town Kings Cross Stoke Newington Hornsey Palmers Green Tulse Hill Camberwell Blackheath Surrey Quays South Kensington West Hampstead East Ham Shadwell Leamouth

Kent

We're based in Westerham, Kent and have strong delivery capability across the county. Kent's commercial property market — particularly around the M25 towns, Sevenoaks and the Medway corridor — generates regular dilapidations work for both landlords and tenants.

Westerham Sevenoaks Tonbridge Kings Hill Tunbridge Wells Maidstone Bromley Dartford Gravesend Rochester Chatham Sittingbourne Canterbury

Essex & the M25 corridor

We cover the M25 business corridor from Dartford to Heathrow, taking in the commercial centres of Essex and Hertfordshire. This belt of out-of-town office parks and business estates generates significant dilapidations volume as leases turn over.

Brentwood Chelmsford Basildon Harlow Epping Romford Grays Thurrock Watford St Albans Hemel Hempstead

Surrey, Sussex & South East

Surrey's commercial property market — Guildford, Reigate, Redhill and the towns along the A3 and M25 — is a consistent source of dilapidations instructions for us. We also work into West Sussex and take selected instructions further across the South East.

Guildford Woking Reigate Redhill Epsom Croydon Sutton Crawley Horsham Brighton
Common Questions

Office dilapidations
frequently asked questions

How much do office dilapidations cost? ▼
Costs vary by the scale and condition of the works required. As a guide: light works (redecoration, minor repairs) typically run £8–£15 per sq ft; mid-range works including strip-out, flooring reinstatement and redecoration run £15–£25 per sq ft; full reinstatement of a complex fit-out runs £25–£45 per sq ft. RICS data puts the all-sector average at around £7.27 per sq ft, but modern offices with significant tenant alterations are consistently in the £15–£25 range. Always factor in an additional 10–15% for professional fees and a 10–20% contingency. We provide a free site survey and return a fixed-price quote within 3–5 working days.
How long does an office dilapidations project take? ▼
We can carry out a free site survey within 48 hours and return a fixed-price quote within 3–5 working days. Works timelines depend on scale: light redecoration for a single floor typically takes 1–2 weeks; full strip-out and reinstatement for a multi-floor office typically takes 4–8 weeks. We always provide a clear programme before works begin so you know exactly what's happening and when.
What is included in a schedule of dilapidations? ▼
A schedule of dilapidations is a formal document prepared by a chartered surveyor listing the repairs, removals and reinstatement works the landlord requires under the lease. It typically includes partition removal, flooring reinstatement, ceiling repairs, redecoration, mechanical and electrical making-good, and removal of tenant fixtures. The specific items depend entirely on what you've done to the space and what your lease says you must return it to.
Can I pay a cash settlement instead of doing the dilapidations works? ▼
Yes — tenants can negotiate a cash settlement with the landlord in lieu of carrying out the works. However, settlements are often higher than the actual cost of the works because the landlord's schedule includes professional fees and a margin. Getting your own contractor's priced schedule first gives you a defensible figure to negotiate with. We price both options so you can make an informed decision.
What happens if I don't carry out dilapidations before my lease ends? ▼
If works aren't completed by lease end, the landlord can appoint their own contractors and recover the full cost from you — at their contractor's rates, not yours. They can also claim professional fees on top, adding 25–30% to the bill. Acting early means you control the contractor, the specification and the cost. Leaving it to the landlord almost always costs more.
Do you work with chartered surveyors on dilapidations? ▼
Yes — we work alongside chartered surveyors on both sides of a dilapidations claim. We can price against an existing schedule, attend site with a surveyor, provide a priced counter-schedule, or supply contractor costs to support a negotiated settlement. We understand the RICS Dilapidations Pre-Action Protocol and know how to price against a Scott Schedule.
Can dilapidations works be done in an occupied building? ▼
Yes — we regularly phase dilapidations around tenants who are still in occupation, either completing floor by floor or working out of hours. If access or disruption is a concern, tell us when you enquire and we'll design the programme around your specific constraints. We won't promise out-of-hours as a standard offering, but we'll always explore what's possible.
What is a Scott Schedule and do I need one? ▼
A Scott Schedule is a formal document recording each item of disrepair with the landlord's and tenant's positions on cost and liability set side by side. It is used in mediation or court proceedings. Most cases settle before that stage, but a priced Scott Schedule from a contractor is a strong negotiating tool. We can provide one on request.
Which areas do you cover for office dilapidations? ▼
Our primary coverage is London (all zones), Kent, Surrey and Essex — including the full M25 corridor. We regularly work in the City, West End, Canary Wharf, and commercial centres across the South East including Guildford, Sevenoaks, Chelmsford and Bromley. Contact us to confirm coverage for your specific location.
Get a Free Survey

Ready to get a straight answer
on your dilapidations costs?

Tell us where the building is, when the lease ends, and whether you have a schedule — we'll take it from there.

The later you start, the less control you have. Once a landlord appoints their own contractors, you lose the ability to control the spec, the programme, or the cost. Getting your own priced schedule early keeps you in the driving seat — whether you do the works or negotiate a settlement.
What happens next 1. We respond within 2 working hours to confirm receipt
2. We arrange a free site visit — usually within 48 hours
3. You receive a fixed-price quote within 3–5 working days
No obligation to proceed at any stage.
Prefer to call or email? 020 3393 9600
[email protected]
Mon – Fri, 8:00am – 5:30pm
Free fixed-price survey

Fill in the form and we'll be in touch within 2 working hours.

We respond within 2 working hours. No spam, ever.

CHAS Accredited Contractor NAFDI Member Good Business Charter
Related Services

Other services that work
alongside this