Fixed-price works. Free site survey within 48 hours. One team from survey to handover — covering London, Kent, Surrey & Essex.
Office dilapidations are the repairs, removals and reinstatement works a tenant must complete when a commercial lease ends. We handle the whole thing — strip-out, structural repairs, flooring reinstatement, ceilings, M&E making-good, and full redecoration — under a single contract with one point of accountability.
You don't coordinate multiple trades. You don't manage a programme. You hand us the schedule and we return you a compliant building.
| Scope | Typical range (per sq ft) | What drives the cost |
|---|---|---|
| Light works Redecoration, minor repairs, basic making-good |
£8 – £15 | Condition of existing finishes, paint specification, access arrangements |
| Mid-range works Strip-out, flooring reinstatement, ceiling repairs, redecoration |
£15 – £25 | Volume of tenant alterations, floor finish spec, M&E making-good requirement |
| Full reinstatement Complex fit-out removal, raised floors, major structural works |
£25 – £45 | Raised floor removal, ceiling grid reinstatement, phasing requirements, specialist M&E |
These are guide figures based on RICS data and recent project experience. Actual costs depend on condition, specification, access and the detail of your lease obligations. A free site visit is required for an accurate fixed-price quote.
Your lease expires in the next 6–12 months and you either have a schedule in hand or expect one. You need to know what the works will actually cost — not what the landlord's surveyor says they'll cost — and whether it makes more sense to do the works or negotiate a cash settlement. We price both options honestly.
Your tenant is vacating and the space needs to be returned to a lettable condition. If the tenant isn't delivering to the required standard, we can work directly from the schedule and recover costs on your behalf. We can also move straight into a refurbishment or fit-out once dilapidations are complete — the same team, no handover gap.
You manage multiple properties and lease exits are a regular occurrence. You need a contractor who understands the RICS protocol, works efficiently against a schedule, and doesn't require hand-holding. We handle dilapidations as part of broader property management programmes across London and the South East.
You're coordinating multiple lease exits across a portfolio — each with different surveyors, landlords and timelines. We work as a consistent delivery partner, providing pre-agreed rates, standardised reporting, and a single point of contact across multiple sites. If you also have PPM contracts to manage, we can fold those in too.
We visit the site, review your schedule of dilapidations alongside the lease terms, and assess current condition. No charge. No obligation. We'll tell you upfront if something on the schedule looks unreasonable.
A fully itemised quote covering every element of the schedule — no provisional sums, no day-rate exposure. You see exactly what each line costs before committing to anything.
We programme the works around your lease exit date, access constraints, and any occupancy requirements. Phased delivery, out-of-hours working, or a clean handover day — whatever the situation demands.
We carry out a full snagging inspection before handover and provide complete documentation — photographic evidence, waste transfer notes, and certificates where required — so the landlord can't come back with a list after you've left.
Leaving it to the last few months means working to the landlord's timeline and their contractor prices. Acting early keeps control on your side.
The landlord's surveyor has served a schedule. Before you accept their costs, get your own contractor's view on what the works actually require.
A priced contractor schedule gives you a defensible figure. Without one, you're negotiating against the landlord's numbers without any basis to push back.
Landlords can serve interim schedules during the tenancy. Early intervention is cheaper than leaving a long list to accumulate before exit.
Understanding your reinstatement obligations before signing a renewal helps you factor exit costs into the commercial decision on whether to stay or go.
If you manage multiple leases, forward planning with a single contractor means consistent pricing and no scramble to find available capacity at short notice.
An interim schedule is served during the lease when conditions have deteriorated. A terminal schedule is served at lease end — the most common type we work from. Both carry legal weight under your lease. We work from whichever applies, and can help scope works before a formal schedule is issued if that's helpful for budgeting.
The RICS Dilapidations Pre-Action Protocol sets out how landlords and tenants should handle disputes before they reach court. It requires surveyors to exchange schedules and responses in a structured way. Understanding this process matters — it prevents either side from being ambushed with costs and sets the frame for negotiation.
A Scott Schedule is a formal document recording each item of disrepair with the landlord's and tenant's positions on cost and liability set side by side. It is used in mediation or court proceedings. Most dilapidations disputes settle before that stage, but a priced Scott Schedule from a contractor is a powerful negotiating tool and we can provide one.
Under Section 18(1) of the Landlord and Tenant Act 1927, a tenant's liability is capped at the diminution in the property's value caused by the disrepair — not necessarily the full cost of the works. If the landlord is redeveloping or refitting the space, some or all of your liability may be reduced. A building surveyor can advise; we provide the contractor pricing to support that case.
A clean handover means more than just the physical works being done. Documentation matters: waste transfer notes, asbestos confirmations where applicable, photographic evidence, electrical certificates, and a clear snagging sign-off. We provide all of this as standard. Landlords have a limited window to raise claims after handover — don't give them a reason.
We collaborate closely with chartered surveyors on both sides of a dilapidations claim. We can price against an existing schedule, attend site with a surveyor, provide a counter-schedule if works are being disputed, or simply supply the contractor costs to support a negotiated settlement. We understand the RICS protocol and price accordingly.
Your lease is ending and you need the works done efficiently and at a defensible cost. We price from your schedule, challenge anything that looks excessive, and deliver a clean handover so you can exit without a residual liability hanging over you.
Your tenant is vacating and the space needs to be brought back to a lettable standard. We work directly from the schedule and coordinate quickly to minimise void period. If you're planning a full refurbishment afterwards, the same team can move straight on to that.
You need a contractor who understands RICS protocol, prices accurately against a schedule, and doesn't create problems at handover. We work within the formal dilapidations process, provide documentation as standard, and communicate clearly throughout — no chasing required.
You're managing lease exits across a portfolio — different buildings, different landlords, different timelines. We work as a consistent delivery partner: agreed rates, standardised processes, single point of contact. Planned maintenance contracts can be managed alongside if needed.
You're assessing dilapidations liability for accounts, due diligence, or lease negotiations. We provide detailed priced schedules that can be used for provisioning, dispute resolution or settlement negotiations — not vague estimates, specific line-by-line costs.
If your situation involves a commercial lease exit and construction works, we're probably the right contractor. Get in touch and we'll tell you straight whether we're the right fit for your job — and if not, we'll point you in the right direction.
Not sure whether your situation fits? Get in touch and we'll tell you straight.
We work exclusively in commercial buildings — offices, managed workspaces, retail and industrial. We understand lease obligations, RICS protocol, and what a compliant commercial handover actually requires. We don't do domestic refurbishments.
Every trade is managed by us — no subcontractor chains you have to manage yourself. Strip-out, repairs, flooring, ceilings, decorating — all under one contract. If something isn't right, one call sorts it.
We quote after a site visit, not from desk estimates. The price you agree is the price you pay — no provisional sums that expand once the work starts. If we find something unexpected, we tell you before we act, not after.
Lease exits have hard deadlines. We programme works to meet them — including evenings, weekends and phased delivery where the building is still occupied. Tell us your constraints when you enquire and we'll design the programme around them.
CHAS accreditation means our health & safety standards are independently verified. Procurement packs, method statements, risk assessments and insurance certificates are available without chasing. Surveyors and managing agents find this makes the process significantly easier.
We're based in Westerham, Kent and cover London, Surrey, Essex and the wider South East. We're honest about geography — if a job is outside our coverage area, we'll say so. We won't take work we can't deliver to the right standard.
"Renova Projects UK has consistently proven to be our top choice for building works. Their team delivers a high standard of quality and attention to detail — and the results speak for themselves."
We carry out office dilapidations across all London zones — City and West End to South and East London. Much of our dilapidations work is in and around the commercial districts of Central and Inner London, where lease exits are frequent and landlord expectations are high.
We're based in Westerham, Kent and have strong delivery capability across the county. Kent's commercial property market — particularly around the M25 towns, Sevenoaks and the Medway corridor — generates regular dilapidations work for both landlords and tenants.
We cover the M25 business corridor from Dartford to Heathrow, taking in the commercial centres of Essex and Hertfordshire. This belt of out-of-town office parks and business estates generates significant dilapidations volume as leases turn over.
Surrey's commercial property market — Guildford, Reigate, Redhill and the towns along the A3 and M25 — is a consistent source of dilapidations instructions for us. We also work into West Sussex and take selected instructions further across the South East.
Tell us where the building is, when the lease ends, and whether you have a schedule — we'll take it from there.
Fill in the form and we'll be in touch within 2 working hours.