📍
Eclipse Park · Turkey Mill · Kent Medical Campus · ME14/ME15

Office Fit-Out & Refurbishment Maidstone

Maidstone runs two very different office markets: modern Cat B space at Eclipse Park and Turkey Mill, and a town centre full of 1960s and 70s stock that needs proper modernisation to compete. We work across both — Cat B fit-outs, refurbishment of legacy buildings, MedTech and healthcare fit-outs at Kent Medical Campus, and dilapidations mitigation for tenants facing lease-end claims.

We know that Week Street and King Street have restricted loading access and no-parking enforcement during the day. We know that multi-let buildings above retail in the town centre need drilling and floor stripping scheduled out of hours. And we're familiar with the Maidstone Borough Council planning portal for when an LTA needs planning alongside it. We're not a national firm passing through — we're based 25 minutes away in Westerham.
We work with
INCOMING TENANTS EXISTING OCCUPIERS MEDTECH & HEALTHCARE LANDLORDS
Accredited
What We Do in Maidstone

Which stage of the
tenant lifecycle are you at?

🏗️
Moving In

Turnkey Cat B Fit-Out

You've taken on a Grade A shell at Eclipse Park or Turkey Mill — or one of the new units coming through at Fielding Park — and you need it made operational. We design and deliver the full Cat B: partitions, private meeting pods, kitchen and breakout, Cat 6a cabling, LED lighting and acoustic treatment. SME tenants taking 2,000–5,000 sq ft are our bread and butter here. We handle the LTA so works start the right side of your landlord.

About our fit-out service →
🔄
Already There

Upgrading 70s Town-Centre Stock

You're in one of Maidstone's older town-centre buildings — the kind that has a tired layout, legacy finishes and common areas that don't reflect how your team works now. We modernise these spaces: reconfiguring open-plan floors into "neighbourhood" zones with fixed desks, soft-seating collaboration areas and acoustic meeting pods, upgrading lighting, refreshing finishes with scrubbable paint systems. The building may be dated — the fit-out doesn't have to be.

About our refurbishment service →
📋
Moving Out

Dilapidations Mitigation

Maidstone landlords are increasingly strict about returning to Cat A. If you didn't record a Schedule of Condition at the start of the tenancy, claims can include defects that pre-existed your lease. We carry out the reinstatement works ourselves — stripping out, reinstating to Cat A, redecorating — at a fraction of what a landlord's surveyor's cash settlement would cost, because professional fee margins come out. We also assess whether Section 18 applies to your building.

About our dilapidations service →
Based in Westerham, Kent

Twenty-five minutes away.
We know the market.

Renova Projects UK is based in Westerham — around 25 minutes from Maidstone town centre. We work regularly across the Kent commercial market, which means we understand the specifics here: the two-tier office landscape, the access constraints on Week Street and King Street, the LTA process in multi-let town-centre buildings, and the MedTech and healthcare occupier requirements at Kent Medical Campus and Maidstone Innovation Centre.

Maidstone's dominant occupier profile is the SME taking 2,000–5,000 sq ft. That's where we do the most work — Cat B fit-outs and modernisation projects for professional services, legal, financial and healthcare firms who need clean, functional, acoustically sound offices.

Cat B office fit-out
70s stock modernisation
MedTech & healthcare fit-out
Licence to Alter submission
Neighbourhood zone layouts
Acoustic partitioning
LED lighting upgrades
Kitchen & breakout areas
Dilapidations mitigation
Schedule of Condition
CHAS Accredited: Renova Projects UK holds CHAS accreditation — independently verifying our health & safety standards. Required by many commercial landlords and managing agents in Maidstone as a pre-qualification condition before contractor works can begin.
Get a free survey →
Office fit-out works in progress — Renova Projects UK deliver Cat B fit-outs across Maidstone, Eclipse Park and Turkey Mill
Cost Guide

What does a Maidstone
office fit-out cost?

Scenario Typical Location Typical Size Cost Range What's typically included
Cat B Fit-Out — Business Park (Grade A shell) Eclipse Park (J7 M20), Turkey Mill 2,000–5,000 sq ft £55–80/sq ft Partitions, meeting rooms, kitchen/breakout, acoustic pods, Cat 6a cabling, LED lighting, LTA package
MedTech & Healthcare Fit-Out Kent Medical Campus, Maidstone Innovation Centre 1,000–5,000 sq ft £80–130/sq ft Scrubbable wall finishes, acoustic partitioning, robust IT infrastructure, server room provisions, clean aesthetics
Town-Centre Stock Refurbishment Maidstone House, Miller House, Week Street area 1,000 sq ft+ £30–50/sq ft Layout reconfiguration, neighbourhood zones, LED upgrade, redecoration, acoustic treatment, kitchen refresh
New Development Cat B Fielding Park (Cambridge Crescent), Somerfield Terrace 1,500–6,000 sq ft £50–75/sq ft Full Cat B from shell, BREEAM-compliant specification, EPC B targeting, LTA included
Cat A+ / Plug-and-Play Personalisation Any Maidstone building with Cat A+ base 500–3,000 sq ft £25–40/sq ft Branding, bespoke joinery, feature lighting, data infrastructure, specialist finishes on top of landlord base
Dilapidations / Cat A Reinstatement Any Maidstone building Any £20–45/sq ft Strip-out, partition removal, Cat A reinstatement, redecoration, M&E making-good, compliance documentation
All costs are indications only. Maidstone fit-out costs vary depending on existing services condition, specification level and out-of-hours programme requirements. Town-centre buildings with shared occupiers typically require evening and weekend working for noisy phases, which adds cost. We provide a fixed-price quote after a free site survey — typically within 3–5 working days.

All-inclusive costs: labour, materials, waste removal and management. LTA preparation (drawings, RAMS, insurance) quoted separately where required. VAT not included.

Maidstone Expertise

Four things that matter
in this market specifically

🔑

LTA in Multi-Let Town-Centre Buildings

Getting a Licence to Alter through in Maidstone's multi-let town-centre stock can be slow. Landlords require technical drawings, M&E specifications, a Construction Phase Plan, RAMS and contractor insurance before they'll sign. In buildings where planning permission is also needed, we liaise directly with the Maidstone Borough Council planning portal to move both processes in parallel. We prepare the full submission and manage it through to sign-off — you don't need to navigate it yourself.

  • Architectural drawings and M&E specs prepared in-house
  • Planning portal submissions handled where required
  • LTA managed through to landlord sign-off
  • Works start the right side of your lease obligations
🌙

Out-of-Hours Logistics — Week Street & Town Centre

Maidstone's town-centre sites have real access constraints. Loading bays on Week Street and King Street are restricted during business hours. In multi-let buildings above retail, noise-sensitive work — drilling, floor stripping, partition removal — must happen in the evenings or at weekends. Parking for contractor vehicles during the day requires active management to avoid fines in the town's controlled zones. We plan the out-of-hours programme from day one, so other occupiers aren't disrupted and building management aren't fielding complaints.

  • Out-of-hours scheduling for noisy phases as standard
  • Loading access planned around Week Street restrictions
  • Contractor vehicle logistics managed proactively
  • Building management kept informed throughout
🏥

MedTech & Healthcare Fit-Out — Kent Medical Campus

The Kent Medical Campus and Maidstone Innovation Centre attract MedTech, healthcare and professional services firms with specific fit-out requirements that go beyond standard Cat B. Clean, clinical aesthetics require scrubbable, high-traffic wall finishes — particularly for firms with any clinical interface. Confidential client and patient consultations demand proper acoustic partitioning. IT infrastructure must be robust: structured cabling, UPS provisions and server room cooling. We understand both the specification and the compliance expectations these occupiers bring.

  • Scrubbable, high-durability paint systems for clinical environments
  • Acoustic partitioning rated for confidential consultation
  • Structured cabling and server room provisions
  • Clean aesthetics aligned to healthcare sector expectations
⚖️

Dilapidations Mitigation — Protect Your Position

Many Maidstone tenants in older town-centre stock are hit with inflated dilapidations claims because they didn't record a Schedule of Condition at the start of the lease. We offer two things: a photographic and written Schedule of Condition at tenancy start (establishing pre-existing defects), and at lease end, we carry out the reinstatement works ourselves to the standard the lease requires — at a fraction of the landlord's cash settlement figure, because professional fee margins on top of contractor rates are removed from the equation. We also assess whether Section 18 applies to your building.

  • Schedule of Condition at tenancy start — protects against pre-existing claims
  • Lease-end dilapidations audit 12 months before expiry
  • Reinstatement works at contractor rates, not surveyor-settlement rates
  • Section 18 assessment included — particularly relevant in regeneration-zone buildings
Who We Work With

Tenants, landlords
and the people in between

🏢

SME Incoming Tenants

The 2,000–5,000 sq ft SME taking a shell at Eclipse Park or Turkey Mill is the core Maidstone fit-out client. You've signed, you have a brief and a budget, and you need it built to programme. We handle the LTA, manage the build and hand over a complete operational workspace.

🔄

Existing Occupiers

You're already in the building but the layout no longer works — too much fixed open-plan, not enough acoustic privacy, finishes that date the space. We reconfigure, upgrade and modernise around live occupation. Disruptive phases are scheduled out of hours.

🏥

MedTech & Healthcare Firms

MedTech, healthcare and life sciences businesses at Kent Medical Campus and Maidstone Innovation Centre need offices that meet their clinical and operational standards. Clean aesthetics, proper acoustic separation, IT infrastructure and compliance-ready finishes — we understand what this sector requires.

⚖️

Legal & Financial Services

Law firms, financial advisers and professional services businesses at Turkey Mill and Eclipse Park require high-end finishes, excellent acoustic privacy in client-meeting rooms and a workspace that projects the professional image their clients expect. We deliver the specification.

🏗️

Landlords & Asset Managers

Repositioning a void unit in Maidstone's two-tier market — whether modernising 70s town-centre stock or delivering Cat A+ in a business park — requires a contractor who understands the local tenant profile. We deliver refurbishments that close the gap between old and new stock.

👔

Property Managers

We coordinate directly with building management, pre-plan out-of-hours access and keep disruption to other occupiers to a minimum. In multi-let town-centre buildings with shared services, this coordination is essential — we treat it as core to the project, not an afterthought.

How It Works

Survey to handover —
the typical sequence

01
Within 48 hours

Free Site Survey

We visit the building in Maidstone, assess the existing condition and note all site-specific constraints — loading access, out-of-hours requirements, shared building rules, LTA or planning considerations. No charge, no obligation. We're 25 minutes from the town centre.

02
3–5 working days

Fixed-Price Quote & LTA Pack

We return a fixed-price quotation covering all labour, materials and waste removal. For fit-outs requiring landlord consent, we prepare the full Licence to Alter submission alongside the quote — drawings, RAMS, insurance, Construction Phase Plan, and planning documents where needed.

03
2–6 weeks (LTA dependent)

LTA Approval & Programme

We submit the LTA to your landlord and manage the approval process. While consent is being obtained, we finalise the build programme, pre-plan out-of-hours phases for town-centre sites, and arrange material deliveries around access restrictions.

04
To programme

Works & Handover

We deliver to the agreed programme — scheduling noisy and disruptive phases out of hours where required, maintaining a clean site, and handing over a snagged, documented workspace with all statutory compliance records included. One point of contact throughout.

Why Renova

Why Maidstone tenants
choose us

📍

Kent-Based — 25 Minutes Away

We're based in Westerham, 25 minutes from Maidstone. Site visits are fast, coordination is easy and we're not billing travel time into every visit. We know the local landlords, the access constraints and the planning process.

📄

We Handle the LTA — Start to Finish

Most contractors hand the Licence to Alter paperwork back to you. We prepare and submit the full package — technical drawings, M&E specs, Construction Phase Plan, RAMS, insurance — and manage the landlord's surveyor and the Council planning portal through to sign-off.

🌙

Out-of-Hours Capability as Standard

Maidstone's town-centre buildings require it. We plan noisy and disruptive phases for evenings and weekends from the outset — Week Street loading access, shared building quiet hours, retail neighbours below. This is built into every town-centre project we run.

💰

Fixed Price — No Surprises

We quote a fixed price after a proper site survey, not a desk estimate. If scope is agreed, that's the number. We don't add variations unless you change the brief.

⚖️

Dilapidations Mitigation Specialists

We carry out reinstatement works at contractor rates — saving you the professional fee margin a landlord's surveyor adds to a cash settlement. We also record Schedules of Condition at tenancy start and assess Section 18 exposure before claims are served.

🛡️

CHAS Accredited

Our CHAS accreditation is independently verified and current — satisfying the health & safety pre-qualification requirements of commercial landlords and managing agents in Maidstone before any works are authorised.

5.0
Client rating

"Renova Projects UK has consistently proven to be our top choice for building works. Their team delivers a high standard of quality and attention to detail — and the results speak for themselves."

PF
P Fewins
Russell Fewins Ltd
Russell Fewins Ltd
Start here

LTA, fit-out, dilapidations —
let's work out what you need

A free site survey takes 30–60 minutes. We visit you in Maidstone, assess the space and give you a clear picture of costs, programme and what the LTA or dilapidations process will involve. No obligation at any stage.

Coverage

Maidstone & across
Kent and the South East

Maidstone Business Parks & Town Centre

We cover Maidstone's two distinct office markets: the business park tier at Eclipse Park (J7 M20), Turkey Mill and the emerging Fielding Park development; and the town-centre stock from Maidstone House to smaller suites on King Street and Week Street. We also cover the Kent Medical Campus and Maidstone Innovation Centre innovation hubs.

Eclipse Park Turkey Mill Kent Medical Campus Maidstone Innovation Centre The Business Terrace Fielding Park Town Centre ME14 Loose Bearsted Allington Tovil Barming

Wider Kent & South East

Based in Westerham, we cover the full Kent commercial market and work regularly across London, Surrey and the South East. If you have a Maidstone office and another site elsewhere, one contractor can handle both.

Aylesford Larkfield West Malling Tonbridge Sevenoaks Tunbridge Wells Sittingbourne Chatham Medway Ashford Canterbury Guildford Croydon City of London South East London
FAQ

Common questions about
Maidstone office fit-outs

Do I need a Licence to Alter for my Maidstone office fit-out? ▼
Yes — in virtually all Maidstone commercial buildings, any non-trivial alterations to leased premises require a formal Licence to Alter signed by your landlord before works can begin. In town-centre multi-let buildings, this process can move slowly — landlords typically require architectural drawings, M&E specifications, a Construction Phase Plan, RAMS and proof of contractor insurance. Where planning permission is also needed, we liaise with the Maidstone Borough Council planning portal to run both processes in parallel. We prepare and submit the full LTA package on your behalf and manage it through to landlord sign-off.
How much does a Cat B office fit-out cost at Eclipse Park or Turkey Mill? ▼
For a Cat B fit-out in a Grade A shell at Eclipse Park or Turkey Mill, budget £55–80 per sq ft for a standard SME specification covering partitions, meeting rooms, kitchen and breakout area, Cat 6a cabling, LED lighting and the LTA package. MedTech and healthcare fit-outs at Kent Medical Campus requiring clean-room finishes, acoustic partitioning and robust IT infrastructure run £80–130 per sq ft. Refurbishment of existing town-centre Cat B space starts from £30 per sq ft. New development Cat B at Fielding Park typically runs £50–75 per sq ft. All ranges exclude VAT. We provide a fixed-price quote after a free site survey, typically within 3–5 working days.
Can you work out of hours in Maidstone town-centre buildings? ▼
Yes — and for most town-centre projects it is essential. Buildings on and around Week Street and King Street have restricted loading bay access and active no-parking enforcement during business hours. In multi-let buildings above retail, noise-sensitive work — drilling, floor stripping, partition removal — must be scheduled for evenings and weekends. Parking for contractor vehicles requires active management to avoid fines in the town's controlled zones. We plan the full out-of-hours programme from day one, so other occupiers are not disrupted and building management are not fielding complaints.
What does a MedTech or healthcare office fit-out involve? ▼
MedTech and healthcare firms at Kent Medical Campus and Maidstone Innovation Centre typically require clean, clinical aesthetics with scrubbable, high-traffic wall finishes — particularly where any clinical interface is present. Confidential consultations with clients or patients demand acoustic partitioning of a higher standard than standard Cat B. IT infrastructure must be robust: structured cabling, UPS provisions and server room cooling where required. We have experience delivering these specifications and understand both the aesthetic and compliance requirements the sector expects.
What is dilapidations mitigation and how does it save money? ▼
When a lease ends, the landlord can issue a Schedule of Dilapidations — a list of repairs they claim the tenant owes. If the tenant has no Schedule of Condition from the start of the tenancy, claims can include defects that pre-existed the lease and should never have been the tenant's liability. We offer two services: a Schedule of Condition at tenancy start (photographic and written, establishing pre-existing defects), and at lease end, we carry out the reinstatement works ourselves at contractor rates. This is typically a fraction of the cash settlement a landlord's surveyor would negotiate, because professional fee margins on top of contractor prices are removed from the equation.
Can Section 18 reduce my dilapidations liability in Maidstone? ▼
Potentially — and it is worth assessing early. Section 18(1) of the Landlord and Tenant Act 1927 limits a landlord's dilapidations claim to the amount by which the value of their interest in the property has been diminished. In Maidstone's town centre, where older stock — including buildings like Maidstone House — faces increasing regeneration and change-of-use pressure, a landlord may be legally prevented from claiming the full cost of repairs if the building is heading for redevelopment or substantial alteration. The Fielding Park and Somerfield Terrace programmes add context to this. We assess your position and identify where this defence applies before the Schedule of Dilapidations is served.
How long does an office fit-out take in Maidstone? ▼
For suites under 1,000 sq ft with a Cat A+ base already in place, allow 2–4 weeks from LTA sign-off. Full Cat B fit-outs in the 2,000–5,000 sq ft SME range — the typical Maidstone project — take 6–12 weeks. Larger corporate or MedTech projects at Eclipse Park or Turkey Mill run 12–20 weeks. The LTA sign-off process takes an additional 2–6 weeks from submission and sits outside the build programme — start early. For town-centre buildings requiring out-of-hours phasing, the effective programme extends and we build this into the schedule from the start.
Get a Free Survey

Tell us about your
Maidstone office

Whether you're fitting out a new space at Eclipse Park, refurbishing town-centre stock, or planning a lease exit — tell us where the building is and what you're looking to do. We'll take it from there.

Town-centre building? Mention the access constraints early. Out-of-hours scheduling, loading access on Week Street and shared building quiet hours all need to be in the programme from day one. Tell us what applies and we'll factor it into the quote.
What happens next 1. We respond within 2 working hours to confirm receipt
2. We arrange a free site visit in Maidstone — usually within 48 hours
3. You receive a fixed-price quote within 3–5 working days
No obligation to proceed at any stage.
Prefer to call or email? 020 3393 9600
[email protected]
Mon – Fri, 8:00am – 5:30pm
Free site survey

Fill in the form and we'll be in touch within 2 working hours.

We respond within 2 working hours. No spam, ever.

CHAS Accredited Contractor NAFDI Member Good Business Charter
Related Services

Other services relevant
to Maidstone tenants