📍
Lakeside · Chafford Hundred · West Thurrock · Grays · RM16–RM20

Office Fit-Out & Refurbishment Lakeside

Taking space at Lakeside Business Village or anywhere in the Thurrock corridor? We deliver Cat B fit-outs, office refurbishments and dilapidations management across Chafford Hundred, West Thurrock, Grays and Tilbury — from 1990s business park units to industrial-office hybrids serving the logistics sector.

Thurrock has its own rules: managed-estate LTA requirements, M25 J30/31 delivery windows, contractor parking permits in Grays, and strict reinstatement clauses in a market where landlords have every incentive to enforce them. We plan for all of it before a single tool goes on site.
We work with
INCOMING TENANTS EXISTING OCCUPIERS LANDLORDS LOGISTICS OPERATORS
Accredited
What We Do in Thurrock

Which stage of the
tenant lifecycle are you at?

🏗️
Moving In

Cat B Fit-Out from a Shell

You've taken on a Cat A shell at Lakeside Business Village or a business park unit in Chafford Hundred — services in, ceiling grid down, but otherwise empty. We design and build the Cat B: partitions, kitchen, meeting rooms, feature lighting, acoustic pods, Cat 6a cabling and branding. We manage the full Licence to Alter process with your landlord so works start on the right side of the lease.

About our fit-out service →
🔄
Already There

Refurbishment of Existing Space

Your office is there but the spec is dated, the layout doesn't work for hybrid patterns, or you need to upgrade to meet ESG requirements. We reconfigure, redecorate, upgrade M&E, install LED and acoustic zones. For industrial-office hybrids in West Thurrock, we also handle acoustic insulation, LVT flooring and intumescent coating maintenance — working in phases or out of hours around live operations.

About our refurbishment service →
📋
Moving Out

Dilapidations & Reinstatement

Thurrock landlords are commercially incentivised to enforce reinstatement strictly — a 4.5% availability rate means empty units are expensive. You'll be required to remove all Cat B alterations and restore the space to Cat A. Section 18(1) does not cap reinstatement costs. We audit your dilapidations exposure early, scope the works, and return the space to a standard your landlord will accept — at a fraction of their surveyor's claim.

About our dilapidations service →
SE England Contractor

We cross the Thames
as standard.

Renova Projects UK is based in Westerham, Kent — 35 minutes from Lakeside via the A25 and M25/Dartford Crossing. We cover Essex as a natural extension of our SE England territory. Site visits are fast, coordination is straightforward and we're not billing you a day's London travel costs when something needs attention.

We work across the full Thurrock commercial landscape: purpose-built business park units at Lakeside Business Village, industrial-office hybrids along the West Thurrock corridor, serviced offices in Grays and Tilbury, and large-scale port administration facilities at London Gateway and Port of Tilbury.

Cat B office fit-out
Office refurbishment
Licence to Alter submission
Acoustic partitioning
LED lighting with PIR/daylight
Carpet tiles & LVT flooring
Intumescent paint (fire protection)
Cat 6a data cabling
Kitchen & breakout areas
Dilapidations & reinstatement
CHAS Accredited: Renova Projects UK holds CHAS accreditation — independently verifying our health & safety standards. Required by most managed-estate landlords in Thurrock before works can proceed.
Get a free survey →
Office fit-out works in progress — Renova Projects UK deliver Cat B fit-outs across Lakeside and Thurrock, Essex
Cost Guide

What does an office fit-out
cost in Thurrock?

Scenario Typical Location Typical Size Cost Range What's typically included
Cosmetic Refresh / Serviced Office Grays (RM17), Tilbury (RM18), Thames Enterprise Centre 100–1,500 sq ft £35–55/sq ft Carpet tiles, redecoration, minor partitioning, door replacement
Business Village Cat B Fit-Out Lakeside Business Village, Chafford Hundred (RM16) 1,500–8,000 sq ft £55–80/sq ft Full Cat B: partitions, kitchen, meeting rooms, LED lighting, Cat 6a, LTA package
Industrial-Office Hybrid Gateway 25, Thurrock Trade Park, West Thurrock (RM20) 500–3,500 sq ft £45–70/sq ft Acoustic insulation, LVT or resilient vinyl flooring, intumescent paint, clean/dirty zone separation
Corporate / Port Administration Port of Tilbury, London Gateway 2,000–20,000 sq ft £80–130/sq ft Design & build, bespoke joinery, AV integration, collaboration zones, full M&E, ESG specification
Dilapidations / Reinstatement Any Thurrock location Any £20–45/sq ft Strip-out, partition removal, Cat A reinstatement, redecoration, M&E making-good
All costs are indications only. Thurrock fit-outs vary significantly based on building type, M&E condition, specification level and programme constraints. Out-of-hours working is often required in multi-tenant buildings and adds cost. We provide a fixed-price quote after a free site survey — typically within 3–5 working days.

All-inclusive costs: labour, materials, waste removal and management. LTA preparation (drawings, RAMS, insurance) quoted separately where required. VAT not included.

Thurrock Expertise

Four things that matter
in this market specifically

📄

Licence to Alter — Managed Estate Rules

Lakeside Business Village and the managed estates at Chafford Hundred and West Thurrock all require a formal Licence to Alter before any non-trivial works can begin. The submission requires architectural drawings, M&E impact assessments, a Construction Phase Plan, RAMS and contractor insurance evidence. Landlords also require assurance that new partitions won't disrupt air conditioning distribution or fire detection coverage across the original Cat A installation. We prepare and submit the full package and manage sign-off.

  • Architectural drawings and M&E impact assessments prepared in-house
  • RAMS and Construction Phase Plan included as standard
  • Liaison with estate management and landlord's surveyor
  • Typical LTA sign-off: 2–6 weeks from submission
🚛

M25 & Dartford Logistics — Planned, Not Hoped For

The M25 J30/31 and Dartford Crossing are a genuine project risk in Thurrock. Delays of 50 minutes or more are common during peak periods, meaning unscheduled deliveries of glass partitions, raised floor panels or structural elements can result in aborted loads and wasted labour costs. We build programme float, schedule all heavy deliveries in shoulder hours (10:00–15:00), pre-book delivery windows with estate management, and arrange contractor parking permits for CPZ works in Grays — all as standard.

  • All heavy deliveries scheduled in 10:00–15:00 shoulder window
  • Programme float built in for Dartford Crossing incidents
  • Contractor parking permits arranged for Grays CPZ works
  • Shared-estate skip and loading bay coordination included
🏭

Industrial-Office Hybrid Expertise

In West Thurrock, many offices are integrated into warehouse and logistics units — a typology that demands skills beyond standard commercial fit-out. The clean-to-dirty zone transition requires acoustic partitioning rated for industrial noise, LVT or resilient vinyl flooring (Polyflor, Altro) that handles dust, moisture and industrial cleaning, and intumescent paint on structural steelwork to satisfy fire compliance. We also manage draught lobby details and flooring transitions at the office-warehouse boundary.

  • Acoustic partitioning for warehouse noise isolation
  • LVT and resilient vinyl for industrial environments
  • Intumescent paint application and compliance documentation
  • Clean/dirty zone separation to managed-estate standard
🌱

Thames Freeport & ESG Credentials

Thames Freeport occupiers at Tilbury, London Gateway and Ford Dagenham are investing in high-specification, sustainable fit-outs — driven by Freeport tax incentives, the Sustainable Construction Programme launched in 2025, and corporate ESG requirements. Fit-outs specifying LED lighting with PIR and daylight sensing, smart HVAC controls, low-VOC carpet tiles and EPC-improving M&E systems are increasingly a requirement rather than an upgrade. We include these as standard components of our specification.

  • LED with PIR and daylight sensing — standard on every project
  • Low-VOC flooring and paint options available
  • Smart sub-metering for energy visibility and EPC performance
  • Specification aligned to Freeport Sustainable Construction standards
Who We Work With

Tenants, landlords
and the people in between

🏢

Incoming Tenants

You've signed or you're close to signing on a Cat A shell in Chafford Hundred or a unit at Lakeside Business Village. We manage the LTA, design the Cat B fit-out and deliver it to programme — so your team can move in on schedule.

🔄

Existing Occupiers

Your office is there but post-pandemic working patterns have changed what you need from it. We reconfigure layouts, add acoustic zones, upgrade to LED and refresh finishes — phased around live occupation so your team isn't disrupted.

🚚

Logistics & Warehouse Operators

Your administrative office sits inside or alongside a warehouse or distribution facility. We understand the industrial site constraints — access restrictions, security gates, ANPR, noisy-works windows — and deliver office works without disrupting operations.

🏗️

Landlords & Asset Managers

Refurbishing void space to Cat A standard ahead of a new letting? We deliver Cat A refurbishments aligned to managed-estate specification, targeting the EPC ratings required by 2027 and 2030 MEES legislation.

👔

Property Managers

We coordinate with estate management on access, pre-register vehicles, arrange parking permits and align our programme with building-wide maintenance schedules. Low disruption to other tenants is treated as a fixed constraint, not a target.

⚖️

Chartered Surveyors

We work from schedules of dilapidations or scope works ahead of a formal schedule. We understand the RICS Pre-Action Protocol, can price against a Scott Schedule, and provide the photographic and documentary record that supports a defensible reinstatement position.

How It Works

Survey to handover —
the typical sequence

01
Within 48 hours

Free Site Survey

We visit your building in Thurrock, assess the existing condition, note any estate-specific constraints — access points, ANPR, security gates, noisy-works windows, parking restrictions — and discuss your requirements. No charge, no obligation.

02
3–5 working days

Fixed-Price Quote & LTA Pack

We return a fixed-price quotation covering all labour, materials and waste. For fit-outs requiring landlord consent, we prepare the full Licence to Alter submission alongside the quote — drawings, M&E impact assessment, RAMS, insurance, Construction Phase Plan.

03
2–6 weeks (LTA dependent)

LTA Approval & Programme

We submit the LTA to your landlord and manage the approval process. While consent is being obtained, we finalise the build programme, arrange material deliveries in appropriate delivery windows, and pre-register all site vehicles with estate management.

04
To programme

Works & Handover

We deliver to the agreed programme — scheduling deliveries in shoulder hours to avoid M25 congestion, phasing noisy works out of hours where required, maintaining a clean site perimeter, and providing a snagged, documented handover. One point of contact throughout.

Why Renova

Why tenants choose us
for Thurrock projects

📍

SE England Base — 35 Minutes from Lakeside

We're based in Westerham, Kent — a straightforward M25 run from Chafford Hundred. Site visits are quick, we're not adding travel time to your project costs, and we can respond fast when something needs attention during works.

📄

We Handle the LTA — Start to Finish

Most contractors hand the LTA paperwork back to you. We prepare and submit the full package: drawings, M&E impact assessment, RAMS, Construction Phase Plan, insurance — and manage the landlord's surveyor through to sign-off.

🚛

Dartford-Ready Logistics as Standard

Every Thurrock project gets a logistics plan: shoulder-hour delivery windows, programme float for Dartford incidents, parking permits arranged, estate management pre-notified. We don't let the M25 become your problem.

🏭

Industrial-Office Hybrid Experience

We understand the acoustic, fire safety and durability requirements of offices integrated into logistics and warehouse facilities — the intumescent coatings, the LVT specification, the clean/dirty zone details. It's not a complication for us; it's a known scope.

💰

Fixed Price — No Surprises

We quote a fixed price based on a proper site survey, not a desk estimate. If scope is agreed, that's the number. We don't add variations unless you change the brief.

🛡️

CHAS Accredited

Our CHAS accreditation is independently verified and current — satisfying the health & safety pre-qualification requirements of managed-estate landlords and property managers across Thurrock before works begin.

5.0
Client rating

"Renova Projects UK has consistently proven to be our top choice for building works. Their team delivers a high standard of quality and attention to detail — and the results speak for themselves."

PF
P Fewins
Russell Fewins Ltd
Russell Fewins Ltd
Start here

LTA, fit-out, refurbishment —
let's work out what you need

A free site survey takes 30–60 minutes. We come to you, assess the space and give you a clear picture of costs, programme and what the LTA process will involve. No obligation at any stage.

Coverage

Thurrock & across
Essex and London

Thurrock — All Four Micro-Markets

We cover the full Thurrock commercial office landscape across all building typologies — purpose-built business parks in Chafford Hundred, industrial-office hybrids in West Thurrock, serviced offices in Grays town centre and Tilbury, and large-format port administration facilities at London Gateway and Port of Tilbury.

Lakeside Business Village Chafford Hundred (RM16) Gateway 25, West Thurrock Thurrock Trade Park (RM20) Grays (RM17) Tilbury (RM18) Thames Enterprise Centre London Gateway Port of Tilbury Stanford-le-Hope Purfleet South Ockendon

Essex, London & South East

Based in Kent with a straightforward route into Essex via the Dartford Crossing, we cover the wider South East commercial market. If you have offices in Thurrock and elsewhere, one contractor can handle both.

Basildon Chelmsford Brentwood Romford Dartford Gravesend Bromley Croydon City of London Canary Wharf East London Maidstone Sevenoaks Tunbridge Wells Kent Surrey
FAQ

Common questions about
Lakeside & Thurrock fit-outs

Do I need a Licence to Alter for works at Lakeside Business Village? ▼
Yes — any non-trivial alterations to leased premises at Lakeside Business Village or other managed estates in Thurrock require a formal Licence to Alter signed by the landlord before works can begin. The submission requires architectural drawings, M&E impact assessments confirming that new partitions won't disrupt air conditioning distribution or fire detection, a Construction Phase Plan, RAMS and proof of contractor insurance. We prepare and submit the full package and manage the landlord's surveyor through to sign-off.
What is the difference between Cat A and Cat B? ▼
Cat A is the base condition a landlord delivers at the start of a lease — building services (HVAC, electrical distribution, fire alarm) installed and commissioned, suspended ceiling grid in place, raised access floor fitted where applicable, and the space otherwise an open shell. Cat B is the tenant fit-out layered on top: internal partitions, kitchen or tea point, meeting rooms, specialist lighting, data cabling, acoustic treatments and branding. At Lakeside Business Village and similar Chafford Hundred business parks, landlords typically deliver space to Cat A standard. You commission the Cat B.
How much does a Cat B office fit-out cost in Thurrock? ▼
Costs vary by location and specification level. Cosmetic refreshment at a serviced office in Grays or Tilbury runs £35–55 per sq ft. A full Cat B fit-out at Lakeside Business Village or Chafford Hundred business parks costs £55–80 per sq ft. Industrial-office hybrid fit-outs in West Thurrock — requiring acoustic insulation, LVT flooring and intumescent paint — typically run £45–70 per sq ft. Corporate headquarters or port administration fit-outs at London Gateway reach £80–130 per sq ft. Out-of-hours working requirements add cost. All ranges are exclusive of VAT. We provide a fixed-price quote after a free site survey, typically within 3–5 working days.
How do you manage deliveries around the M25 and Dartford Crossing? ▼
The M25 J30/31 and Dartford Crossing are a genuine programme risk. Delays of 50 minutes or more are common, particularly around incidents at the crossing, and arriving late with a heavy delivery — glass partitions, raised floor panels, structural steelwork — can mean aborted loads and wasted labour. We schedule all heavy deliveries in the 10:00–15:00 shoulder window to avoid peak congestion, build float into the programme for Dartford incidents, pre-book delivery windows with estate management, and arrange contractor parking permits for any works in Grays CPZ. Logistics planning is part of every Thurrock project scope, not an afterthought.
Can you fit out industrial-office spaces in West Thurrock? ▼
Yes — this is a specialism. In West Thurrock (RM20), offices integrated into warehouse and logistics facilities require a different approach to standard commercial fit-out. We specify acoustic partitioning rated for industrial noise levels, LVT or resilient vinyl flooring (Polyflor, Altro) that handles industrial dust, moisture and cleaning chemicals, and apply or maintain intumescent paint on structural steelwork where required for fire compliance. We also design and build the clean-to-dirty zone transition — the boundary between office and warehouse — with appropriate draught lobbies, flooring transitions and acoustic seals.
What are my dilapidations obligations at lease end in Thurrock? ▼
Thurrock landlords are commercially incentivised to enforce reinstatement strictly. With office availability at a historic low of 4.5%, void periods are expensive — meaning landlords will serve a full Schedule of Dilapidations and pursue a Quantified Demand if you don't act first. You will typically be required to remove all Cat B alterations and reinstate the space to its original Cat A condition. Critically, reinstatement of tenant alterations is not subject to the Section 18(1) cap on dilapidations damages — landlords can insist on the full cost. Running a dilapidations audit at least 12 months before lease end, and carrying out the works yourself, is almost always more cost-effective than settling the landlord's claim with its professional fee margins added on top.
Does the Thames Freeport affect how I should specify my fit-out? ▼
If you are occupying space within or near the Thames Freeport tax sites at Tilbury, London Gateway or Ford Dagenham, yes. Freeport occupiers are eligible for business rate and SDLT relief, which is driving investment in higher-specification, sustainable fit-outs. The Freeport's Sustainable Construction Programme — launched November 2025 — also creates a reputational incentive to demonstrate green credentials. In practice, this means specifying LED lighting with PIR and daylight sensing, smart HVAC controls, low-VOC flooring materials and EPC-improving M&E systems. We include LED with PIR as a baseline standard on every project, and can advise on the broader specification upgrades that support EPC C by 2027 and EPC B by 2030 compliance.
Get a Free Survey

Tell us about your
Lakeside or Thurrock office

Whether you're fitting out a new space, refurbishing an existing one, or planning a lease exit — tell us where the building is and what you're looking to do. We'll take it from there.

Starting the LTA early saves programme time. A Licence to Alter can take 2–6 weeks to sign off. If you're working to a move-in date, the LTA submission needs to go in before you start buying furniture. Talk to us first.
What happens next 1. We respond within 2 working hours to confirm receipt
2. We arrange a free site visit in Thurrock — usually within 48 hours
3. You receive a fixed-price quote within 3–5 working days
No obligation to proceed at any stage.
Prefer to call or email? 020 3393 9600
[email protected]
Mon – Fri, 8:00am – 5:30pm
Free site survey

Fill in the form and we'll be in touch within 2 working hours.

We respond within 2 working hours. No spam, ever.

CHAS Accredited Contractor NAFDI Member Good Business Charter
Related Services

Other services relevant
to Thurrock tenants