Getting the paint specification right on a commercial project matters more than most people realise. An under-specified system — wrong primer, too few coats, inadequate preparation — will fail early, look poor at handover, and create liability. An over-specified system wastes budget. This guide provides a working technical reference to help surveyors and FMs write specifications that are both technically sound and commercially proportionate.

It covers interior works. For external or structural coatings, corrosion protection systems or specialist industrial finishes, separate references apply.

1. Surface Preparation

Surface preparation determines the outcome more than any other single factor in a paint system. Paint applied to a poorly prepared substrate will fail regardless of product quality. The specification should describe the required preparation standard as precisely as the paint system itself.

Existing painted surfaces — sound condition

  • Wash down all surfaces with sugar soap solution; rinse and allow to dry fully
  • Fill all cracks, holes and surface defects with appropriate filler; sand flush when cured
  • Abrade any areas of high gloss finish to provide key
  • Spot prime any bare areas with appropriate primer before full coats
  • Where staining (watermarks, nicotine, marker pen) is present, apply stain-blocking primer to affected areas before finishing coats

Existing painted surfaces — poor condition (flaking, peeling, heavily stained)

  • Strip back loose and defective material; scrape and sand to a sound substrate
  • Fill, prime and make good all repaired areas
  • Full stain-blocking primer coat over all surfaces where contamination is present
  • Assess whether a full strip and re-skim is required before redecorating — this is a plastering scope item, not a decorating one

New plaster — walls and ceilings

  • Allow minimum 28 days cure time before painting (longer for thick coats or in low-temperature conditions)
  • Test moisture content where programme is critical — target below 5% before coating
  • Apply mist coat as first coat: trade emulsion thinned 10–20% with clean water, or proprietary mist coat product — do not use neat vinyl silk or soft sheen as first coat on new plaster
  • Allow mist coat to dry fully before finishing coats

New plasterboard — unsealed

  • Apply plasterboard primer/sealer before finishing coats — unsealed plasterboard absorbs moisture unevenly, causing patchiness and joint shadowing through the finish
  • Ensure all joint tape and filler is flush and sanded before priming

Timber — doors, skirting, architrave

  • Sand all surfaces to remove nibs and provide key; vacuum and wipe down with tack cloth
  • Apply knotting compound to any exposed resinous knots before priming
  • For MDF: apply MDF primer/sealer to all cut edges and faces — MDF is highly absorbent and will telegraph texture without a sealing primer
  • For softwood: apply wood primer or equivalent before undercoat
  • Apply undercoat before finishing coats where colour change requires it, or as part of a full specification system

Metal — radiators, pipework, steelwork

  • Degrease thoroughly; abrade to remove any surface rust or scale
  • Apply compatible metal primer — zinc phosphate primer is the standard for structural steelwork; for radiators and pipework, use a heat-resistant primer where surface temperatures may exceed 80°C
  • Do not apply standard emulsion or oil-based finishes to surfaces that will reach high temperatures — use heat-resistant enamel

2. Paint Systems by Substrate

The following are standard specification systems for commercial interior decorating. Product types are described generically — the specification should reference named products or an approved equivalent.

System A — Internal walls & ceilings: new plaster (3-coat)

  1. Coat 1 — Mist coat: Trade emulsion thinned 10–20% with water (or proprietary mist coat)
  2. Coat 2 — First finishing coat: Full trade emulsion, applied full strength
  3. Coat 3 — Second finishing coat: Full trade emulsion, same product

Minimum system for new plaster. Do not reduce to 2 coats without a purpose-made primer-sealer as coat 1.

System B — Internal walls & ceilings: existing painted, sound condition (2-coat)

  1. Preparation: Wash, fill, sand, spot prime bare areas
  2. Coat 1 — First finishing coat: Full trade emulsion
  3. Coat 2 — Second finishing coat: Full trade emulsion

Standard for routine redecorating to existing sound surfaces. Where significant staining or patching is present, add stain-block primer as additional first coat.

System C — Timber joinery: existing painted, recoat (2-coat)

  1. Preparation: De-nib, sand, wash, spot prime bare areas
  2. Coat 1 — Undercoat: Appropriate undercoat (where required for colour change or coverage)
  3. Coat 2 — Finishing coat: Waterborne eggshell or satin finish

For a full strip and repaint (e.g. dilapidations reinstatement), add full strip and prime as pre-treatment before undercoat.

System D — Timber joinery: new MDF (3-coat minimum)

  1. Coat 1 — Primer/sealer: MDF primer, applied to all faces and particularly cut edges
  2. Coat 2 — Undercoat: Appropriate undercoat
  3. Coat 3 — Finishing coat: Waterborne eggshell or satin

A 4-coat system (primer + undercoat + 2 finish coats) is standard for high-specification or high-visibility joinery.

System E — Metal: radiators, pipework, structural steelwork (3-coat)

  1. Preparation: Degrease, abrade, remove loose scale or rust
  2. Coat 1 — Metal primer: Zinc phosphate or compatible metal primer
  3. Coat 2 — Undercoat: Oil-based or compatible waterborne undercoat
  4. Coat 3 — Finishing coat: Gloss or satin finish compatible with primer system

For heating pipework and radiators where surface temperatures exceed 80°C, specify heat-resistant enamel throughout — standard oil-based systems will yellow and peel.

3. Sheen Level Selection

Sheen level affects durability, cleanability, and how much it highlights surface imperfections. Specifying the wrong sheen for the location is one of the most common errors in commercial decorating — a high-sheen finish in a space with poor plasterwork will show every defect; too flat a finish in a high-traffic corridor will mark and scuff within months.

Sheen Level Typical Application Notes
Dead Matt / Flat Matt Feature walls, textured surfaces, heritage interiors Maximum concealment of surface imperfections. Not washable — unsuitable for high-traffic areas
Matt Ceilings, low-traffic walls Standard office ceiling finish. Poor washability — mark carefully in specification for wall use
Soft Sheen Office walls, corridors, meeting rooms Most widely used for commercial interiors. Low sheen with improved cleanability over matt
Silk Walls in higher-specification spaces Noticeably more reflective than soft sheen. Will telegraph surface imperfections — substrate quality must be good
Satin (waterborne) Reception areas, high-traffic walls, timber joinery Durable, washable. Appropriate for doors, skirting and joinery where a modern low-maintenance finish is required
Eggshell (oil-based) Timber joinery — traditional finish Slower drying, stronger odour than waterborne alternatives. Produces very hard wearing finish but less appropriate in occupied environments
Gloss External-facing elements, metalwork, high-wear joinery Maximum durability and cleanability. High reflectivity — will show substrate defects. Not typically used on internal walls

4. VOC Compliance in Commercial Environments

VOC (Volatile Organic Compound) limits for decorative paints are set under EU Directive 2004/42/CE (retained in UK law). Phase 2 limits have applied since 2010. All compliant products sold in the UK must display their VOC content on the tin.

Product Type VOC Limit (Phase 2)
Interior matt emulsion ≤ 30 g/l
Interior non-matt emulsion (soft sheen, silk) ≤ 100 g/l
Interior trim & joinery — waterborne ≤ 150 g/l
Interior trim & joinery — solvent-borne ≤ 400 g/l

Occupied environments — additional requirements

Where decorating is carried out in a live or part-occupied office, VOC compliance alone is not sufficient. The specification should additionally require:

  • Low-VOC or near-zero-VOC products — specify ≤10 g/l where practicable; most leading trade ranges now offer ultra-low-VOC options at no significant cost premium
  • COSHH assessment — a contractor working in an occupied space must hold a site-specific COSHH assessment covering all products in use
  • Adequate ventilation — specify that all areas being decorated are ventilated during application and for the drying period; clarify whether this is the contractor's responsibility to arrange or the client's
  • Work outside core hours — where products with higher VOC content are unavoidable (e.g. specialist primers), specify application outside occupied hours with a defined dwell period before reoccupation
  • Product data sheets at handover — require the contractor to provide TDS and SDS documents for all products used, particularly if the building holds a BREEAM or WELL certification

Free Site Visit

We'll come and look before we quote.

We visit the site before pricing — not just the specification. That means our quote reflects the actual condition of the substrate, not assumptions on paper. Fixed price, method statements, COSHH assessments and photographic completion records as standard.

See Our Painting Service →

5. Coat Counts — Quick Reference

The following coat counts represent standard commercial practice. They are minima, not targets — complex colour changes, poor substrate condition or high-specification finishes may all require additional coats.

Surface / Situation Minimum Coat Count Notes
Ceilings — existing, sound 2 finishing coats Preparation + 2 coats matt emulsion
Ceilings — new plaster 1 mist + 2 finishing 3-coat minimum on new plaster
Walls — existing, sound 2 finishing coats Spot prime bare areas before finishing coats
Walls — new plaster 1 mist + 2 finishing 3-coat minimum; allow plaster to cure fully first
Walls — new plasterboard 1 sealer + 2 finishing Plasterboard primer/sealer essential as first coat
Timber joinery — recoat 1 undercoat + 1 finish 2 finishing coats for high-visibility or colour-critical elements
Timber joinery — new MDF 1 primer + 1 undercoat + 1 finish 4-coat for high specification (primer + undercoat + 2 finish)
Metal — primer + finish 1 primer + 1 undercoat + 1 finish Preparation is as critical as the coating system

6. The Dilapidations Standard

Where painting works are specified as part of a schedule of dilapidations, the governing standard is almost always described as "good and substantial repair and in good decorative order" — or a close variant. This phrase is a legal standard, not a construction specification, and understanding the difference matters.

What "good decorative order" means in practice

It does not require a perfect or as-new finish. It requires a standard that a reasonable incoming tenant would find acceptable — typically described as:

  • All painted surfaces even in colour, without visible patchwork, shadows or uneven coverage
  • No visible staining, scuffs, marks or damage showing through the finish
  • Surfaces properly prepared — not painted over unrepaired defects
  • Colour consistent with original lease specification or, where altered, returned to a neutral landlord-approved finish
  • Joinery finished to the same standard as the walls — not left in a lesser condition because it was "harder to access"

Fair wear and tear

Leases typically exclude fair wear and tear from the tenant's obligations. In practice, a building surveyor assessing a dilapidations schedule will consider the age of the premises and the original state of decoration — a tenant vacating after 10 years is not expected to deliver the same standard as one leaving after 2 years. The RICS guidance on dilapidations (the Dilapidations Protocol) requires both parties' surveyors to act reasonably and proportionately.

When a schedule of condition applies

Where the lease was entered into with a schedule of condition attached, this document defines the baseline — the tenant's obligation is to return the premises in no worse a condition than recorded at the start. This can significantly limit the decorating liability, particularly in buildings that were already in partial disrepair at lease commencement.

Reinstatement of tenant alterations

Where a tenant has applied a branded colour scheme, painted over a landlord-specified neutral finish, or used non-standard products (such as specialist coatings, anti-graffiti finishes or textured paint systems), the schedule will typically require reinstatement to the original specification. This is distinct from routine redecoration and often involves stripping and full preparation before recoating — it should be specified and priced accordingly, not assumed to be covered by a standard 2-coat repaint rate.

7. Writing the Specification

A complete paint specification for commercial decorating works should include the following elements. The level of detail required increases with project complexity and value — a routine dilapidations redecoration can be covered in a few pages; a full refurbishment specification may reference NBS clause M60 in full.

Minimum required elements

  • Substrate description: What is being painted and its current condition (e.g. "existing painted plasterboard walls, sound condition, minor filling required")
  • Preparation method: Wash, fill, sand, prime — described specifically for each substrate
  • Paint system: Primer type (if applicable), undercoat (if applicable), number of finishing coats, product type or equivalent
  • Sheen level: State clearly — not "as existing" unless the existing condition and sheen level have been confirmed
  • Colour reference: BS 4800 number, RAL code, NCS reference, or manufacturer's colour name and range. "White" is not a specification
  • VOC requirements: State maximum VOC limit in g/l if applicable, particularly for occupied environments
  • Special requirements: Anti-mould additive for wet areas, fire-retardant coating where required, anti-graffiti topcoat for ground-level external surfaces
  • Coverage and spreading rate: For large areas, specify minimum wet film thickness or spreading rate — this prevents contractors cutting coverage to save material
  • Access and protection: Responsibility for masking, sheeting and protection of adjacent surfaces and furniture
  • Inspection hold point: State whether an inspection is required after preparation and before application of finishing coats (recommended on higher-value projects)
  • Documentation at handover: Product data sheets, colour references, any VOC certificates or COSHH assessments

Quick Reference — Common Specification Failures

  • Insufficient coat count on new plaster — 2 coats of emulsion on new plaster without a mist coat will peel within months
  • Wrong primer for MDF — standard wood primer does not seal MDF adequately; the finish will look uneven and edges will swell
  • "White" as a colour specification — there are hundreds of white paints across major manufacturers; specify BS 4800, RAL or a named product
  • No mention of preparation — a specification that describes the paint system but not the preparation standard is incomplete; contractors will do the minimum
  • High VOC products in occupied spaces — legally compliant products can still cause disruption and complaints without low-VOC specification in live environments
  • Ignoring sheen level on imperfect substrates — silk or gloss on walls with minor undulation will highlight every imperfection under raking light
  • Assuming "redecoration" covers reinstatement — returning from a bold colour scheme to white is a strip-and-repaint job, not a 2-coat repaint; price accordingly